Ok so alot of work has been done on the garage since the last post. The trusses are set, fireblocks are in, and the framing and wiring is essentially finished. It has been a while since we have posted anything but in the time between our last post and this one we have set the trusses; this was an adventure in itself. Usually crews use a crane to lift the trusses up and set them on the roof where they need to be. This crew's crane was a 12' 2X4 and three guys. We lifted them up between the walls upside down and then flipped them over and nailed them in place. The day after this we sheeted some of the gables (sides) and put the framing in between them. This SUCKED as the wind was blowing exceptionally hard even by Herriman's standards. But we got it done.


I also built my first and only set of stairs in the garage which lead up to the attic space. This was quite a feat because if I messed them up it would make them difficult to climb and expensive to fix at the very least. But they turned out good, I think.


After that we finished sheeting the rest of the roof and the tops of the walls. We ran several hundred feet of wire, dug trenches (YAY TRENCHING!) and moved sprinkler heads along with putting a water spicket out there for the hose. My dad did the wiring, I just tried to feel important by trying to help but he did it all, thanks dad!


It is getting inspected on Wednesday and then there will be shingles, sheetrock, lights, and all kinds of stuff to do. I will post pics as they become available...stay tuned if you care!

3 comments:

Ben and Jessica said...

That is AMAZING!! It looks fantastic! Good job!

Anonymous said...

WoW!!!! good job boys!! looks like things are coming along great. Cant wait to see it!! love you guys

Anonymous said...

WoW!!!! good job boys!! looks like things are coming along great. Cant wait to see it!! love you guys